IAC Assessment: SF0486
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0486
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2016
Principal Product canned olives
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 57,000
Annual Production 23,725 Units
Production Hrs. Annual 2,520
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $710,861 7,816,909 kWh $0.09
Electricity Demand $532,593 19,458 kW-months/year $27.37
Electricity Fees $24,255 - $ -
Natural Gas $324,590 72,803 MMBtu $4.46
TOTAL ENERGY COSTS $1,592,299
RECOMMENDED SAVINGS* $166,614 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $84,962
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$833
Cost:
-
$833 9,164 - - - - - - $833
9,164
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,280
Cost:
-
$2,280 32,457 - - - - - - $2,280
32,457
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.2111 INSTALL STEAM TRAP Savings:
$59,001
Cost:
$20,027
- - - - $58,930 13,213 $71 1,066 -
-
kWh
-
-
kW-months/year
$58,930
13,213
MMBtu
$71
1,066
Tgal
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$60,071
Cost:
$20,763
$60,071 660,561 - - - - - - $60,071
660,561
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,616
Cost:
$1,456
- - - - $1,616 362 - - -
-
kWh
-
-
kW-months/year
$1,616
362
MMBtu
-
-
Tgal
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$21,035
Cost:
$22,499
- - - - $21,035 4,504 - - -
-
kWh
-
-
kW-months/year
$21,035
4,504
MMBtu
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,334
Cost:
$11,830
$3,893 42,807 $2,441 89 - - - - $3,893
42,807
kWh
$2,441
89
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$15,444
Cost:
$46,053
$8,074 88,787 $7,370 269 - - - - $8,074
88,787
kWh
$7,370
269
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$166,614
Cost:
$122,628
$75,151 833,776 $9,811 358 $81,581 18,079 $71 1,066 $75,151
833,776
kWh
$9,811
358
kW-months/year
$81,581
18,079
MMBtu
$71
1,066
Tgal
TOTAL IMPLEMENTED Savings:
$84,962
Cost:
$78,646
$75,151 833,776 $9,811 358 - - - - $75,151
833,776
kWh
$9,811
358
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage