IAC logo
IAC Assessment: SF0545
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0545
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2019
Principal Product Asphalt and Aggregates
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $1,000,000-$5,000,000
# of Employees 14
Plant Area (Sq.Ft.) 250,000
Annual Production 750,000 Units
Production Hrs. Annual 2,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $350,780 2,867,666 kWh $0.12
Electricity Demand $421,899 12,744 kW-months/year $33.11
LPG $390,252 47,351 MMBtu $8.24
TOTAL ENERGY COSTS $1,162,931
RECOMMENDED SAVINGS* $269,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $246,832
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,151
Cost:
$1,194
- - - - $1,151 140 -
-
kWh
-
-
kW-months/year
$1,151
140
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$14,442
Cost:
$17,400
- - - - $14,442 1,753 -
-
kWh
-
-
kW-months/year
$14,442
1,753
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,924
Cost:
$11,386
$2,991 24,451 $3,933 119 - - $2,991
24,451
kWh
$3,933
119
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,065
Cost:
$2,276
$460 3,764 $605 18 - - $460
3,764
kWh
$605
18
kW-months/year
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,742
Cost:
$17,476
$1,857 15,184 $4,885 148 - - $1,857
15,184
kWh
$4,885
148
kW-months/year
-
-
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$238,757
Cost:
$1,300,334
$200,241 1,637,025 $38,516 1,788 - - $200,241
1,637,025
kWh
$38,516
1,788
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$269,081
Cost:
$1,350,066
$205,549 1,680,424 $47,939 2,073 $15,593 1,893 $205,549
1,680,424
kWh
$47,939
2,073
kW-months/year
$15,593
1,893
MMBtu
TOTAL IMPLEMENTED Savings:
$246,832
Cost:
$1,312,914
$203,232 1,661,476 $42,449 1,907 $1,151 140 $203,232
1,661,476
kWh
$42,449
1,907
kW-months/year
$1,151
140
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG