Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2019 |
Principal Product | Plastic containers |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $50,000,000-$100,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 182,100 |
Annual Production | 38,000,000 Pounds |
Production Hrs. Annual | 8,064 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,017,743 | 27,488,993 | kWh | $0.07 |
Electricity Demand | $988,098 | 56,307 | kW-months/year | $17.55 |
Natural Gas | $20,397 | 1,856 | MMBtu | $10.99 |
TOTAL ENERGY COSTS | $3,026,239 | |||
RECOMMENDED SAVINGS* | $250,335 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $76,855 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $34,284 Cost: - |
$23,380 | 318,528 | $24,956 | 1,404 | $(-14,052) | (-1,279) |
$23,380 318,528 kWh |
$24,956 1,404 kW-months/year |
$(-14,052) (-1,279) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,962 Cost: $360 |
$5,135 | 69,964 | $1,827 | 108 | - | - |
$5,135 69,964 kWh |
$1,827 108 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,625 Cost: $240 |
$8,625 | 117,512 | - | - | - | - |
$8,625 117,512 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $8,499 Cost: $960 |
$8,499 | 115,786 | - | - | - | - |
$8,499 115,786 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $40,841 Cost: $4,800 |
$30,123 | 410,401 | $10,718 | 611 | - | - |
$30,123 410,401 kWh |
$10,718 611 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $6,127 Cost: $1,647 |
$6,127 | 83,467 | - | - | - | - |
$6,127 83,467 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,069 Cost: $7,542 |
$4,069 | 55,441 | - | - | - | - |
$4,069 55,441 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $17,743 Cost: $33,601 |
$17,743 | 241,736 | - | - | - | - |
$17,743 241,736 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,114 Cost: $6,574 |
$3,114 | 42,422 | - | - | - | - |
$3,114 42,422 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $120,071 Cost: $1,107,885 |
$99,252 | 1,352,208 | $20,819 | 1,176 | - | - |
$99,252 1,352,208 kWh |
$20,819 1,176 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $250,335 Cost: $1,163,609 |
$206,067 | 2,807,465 | $58,320 | 3,299 | $(-14,052) | (-1,279) | $206,067 2,807,465 kWh |
$58,320 3,299 kW-months/year |
$(-14,052) (-1,279) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $76,855 Cost: $42,422 |
$64,124 | 873,629 | $26,783 | 1,512 | $(-14,052) | (-1,279) | $64,124 873,629 kWh |
$26,783 1,512 kW-months/year |
$(-14,052) (-1,279) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |