Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2020 |
Principal Product | Potato Chips, Corn Chips, and Similar Snacks |
NAICS | 311919 - Other Snack Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | >$500,000,000 |
# of Employees | 1,000 |
Plant Area (Sq.Ft.) | 540,000 |
Annual Production | 165,924,726 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,829,947 | 27,273,502 | kWh | $0.07 |
Electricity Demand | $842,282 | 49,752 | kW-months/year | $16.93 |
Electricity Fees | $264,115 | - | $ | - |
Natural Gas | $3,521,406 | 497,693 | MMBtu | $7.08 |
TOTAL ENERGY COSTS | $6,457,750 | |||
RECOMMENDED SAVINGS* | $162,061 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $118,378 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,941 Cost: - |
$5,781 | 86,155 | - | - | - | - | $(-840) | - |
$5,781 86,155 kWh |
- - kW-months/year |
- - MMBtu |
$(-840) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER |
Savings: $98,999 Cost: $34,416 |
- | - | - | - | $98,999 | 13,961 | - | - |
- - kWh |
- - kW-months/year |
$98,999 13,961 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,186 Cost: $525 |
$1,186 | 17,681 | - | - | - | - | - | - |
$1,186 17,681 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,252 Cost: $4,542 |
$9,252 | 137,880 | - | - | - | - | - | - |
$9,252 137,880 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,759 Cost: $2,995 |
$4,759 | 70,928 | - | - | - | - | - | - |
$4,759 70,928 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $282 Cost: $379 |
- | - | - | - | $282 | 40 | - | - |
- - kWh |
- - kW-months/year |
$282 40 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $30,342 Cost: $50,211 |
- | - | - | - | $30,342 | 4,279 | - | - |
- - kWh |
- - kW-months/year |
$30,342 4,279 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,149 Cost: $6,701 |
$3,149 | 46,925 | - | - | - | - | - | - |
$3,149 46,925 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $145 Cost: $591 |
$145 | 2,157 | - | - | - | - | - | - |
$145 2,157 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $9,006 Cost: $75,000 |
$9,857 | 146,895 | $3,407 | 201 | $(-4,258) | (-600) | - | - |
$9,857 146,895 kWh |
$3,407 201 kW-months/year |
$(-4,258) (-600) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $162,061 Cost: $175,360 |
$34,129 | 508,621 | $3,407 | 201 | $125,365 | 17,680 | $(-840) | - | $34,129 508,621 kWh |
$3,407 201 kW-months/year |
$125,365 17,680 MMBtu |
$(-840) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $118,378 Cost: $42,923 |
$19,937 | 297,120 | - | - | $99,281 | 14,001 | $(-840) | - | $19,937 297,120 kWh |
- - kW-months/year |
$99,281 14,001 MMBtu |
$(-840) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |