Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2022 |
Principal Product | Tomato Sauce |
NAICS | 311421 - Fruit and Vegetable Canning |
SIC | 2033 - Canned Fruits And Vegetables |
Sales | $50,000,000-$100,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 225,000 |
Annual Production | 4,660,000 Units |
Production Hrs. Annual | 6,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $565,664 | 5,024,552 | kWh | $0.11 |
Electricity Demand | $304,162 | 12,288 | kW-months/year | $24.75 |
Natural Gas | $309,351 | 40,562 | MMBtu | $7.63 |
TOTAL ENERGY COSTS | $1,179,177 | |||
RECOMMENDED SAVINGS* | $130,482 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $127,536 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $21,960 Cost: - |
$21,960 | 146,181 | - | - | - | - |
$21,960 146,181 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $7,144 Cost: - |
$7,144 | 75,357 | - | - | - | - |
$7,144 75,357 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $29,881 Cost: $2,290 |
- | - | - | - | $29,881 | 3,916 |
- - kWh |
- - kW-months/year |
$29,881 3,916 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $10,294 Cost: $2,290 |
- | - | - | - | $10,294 | 1,349 |
- - kWh |
- - kW-months/year |
$10,294 1,349 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $22,836 Cost: $41,117 |
$17,477 | 109,372 | $5,359 | 216 | - | - |
$17,477 109,372 kWh |
$5,359 216 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $24,257 Cost: $45,587 |
$24,257 | 151,795 | - | - | - | - |
$24,257 151,795 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $8,094 Cost: $17,764 |
$8,094 | 50,654 | - | - | - | - |
$8,094 50,654 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $376 Cost: $961 |
- | - | - | - | $376 | 49 |
- - kWh |
- - kW-months/year |
$376 49 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $3,070 Cost: $11,782 |
- | - | - | - | $3,070 | 402 |
- - kWh |
- - kW-months/year |
$3,070 402 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,570 Cost: $11,279 |
$2,570 | 16,083 | - | - | - | - |
$2,570 16,083 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $130,482 Cost: $133,070 |
$81,502 | 549,442 | $5,359 | 216 | $43,621 | 5,716 | $81,502 549,442 kWh |
$5,359 216 kW-months/year |
$43,621 5,716 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $127,536 Cost: $120,830 |
$78,932 | 533,359 | $5,359 | 216 | $43,245 | 5,667 | $78,932 533,359 kWh |
$5,359 216 kW-months/year |
$43,245 5,667 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |