IAC Assessment: SF0590
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0590
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2022
Principal Product Treated Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 958,320
Annual Production 6,200,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $282,469 2,652,856 kWh $0.11
Electricity Demand $316,992 14,124 kW-months/year $22.44
Natural Gas $278,217 40,607 MMBtu $6.85
TOTAL ENERGY COSTS $877,678
RECOMMENDED SAVINGS* $263,554 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $212,797
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$79,227
Cost:
$13,234
$61,476 577,237 $17,751 790 - - $61,476
577,237
kWh
$17,751
790
kW-months/year
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$38,848
Cost:
$11,000
$5,687 53,403 $25,673 1,144 $7,488 - $5,687
53,403
kWh
$25,673
1,144
kW-months/year
$7,488
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$65,729
Cost:
$89,990
$54,119 508,161 $11,610 516 - - $54,119
508,161
kWh
$11,610
516
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,777
Cost:
$19,007
$6,777 63,630 - - - - $6,777
63,630
kWh
-
-
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,909
Cost:
$34,177
$11,909 111,825 - - - - $11,909
111,825
kWh
-
-
kW-months/year
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$61,064
Cost:
$434,923
$61,064 573,367 - - - - $61,064
573,367
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$263,554
Cost:
$602,331
$201,032 1,887,623 $55,034 2,449 $7,488 - $201,032
1,887,623
kWh
$55,034
2,449
kW-months/year
$7,488
-
$
TOTAL IMPLEMENTED Savings:
$212,797
Cost:
$557,154
$183,436 1,722,395 $29,361 1,306 - - $183,436
1,722,395
kWh
$29,361
1,306
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes