Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2023 |
Principal Product | Anodizing, Plating |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 24 |
Plant Area (Sq.Ft.) | 10,850 |
Annual Production | 20,000 Units |
Production Hrs. Annual | 2,750 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $62,180 | 507,648 | kWh | $0.12 |
Electricity Demand | $16,539 | 1,893 | kW-months/year | $8.74 |
Natural Gas | $54,628 | 3,302 | MMBtu | $16.54 |
TOTAL ENERGY COSTS | $133,347 | |||
RECOMMENDED SAVINGS* | $40,035 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,446 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,621 Cost: - |
$16,621 | 135,680 | - | - | - | - |
$16,621 135,680 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2514 COVER OPEN TANKS |
Savings: $5,939 Cost: $1,586 |
$5,939 | 48,482 | - | - | - | - |
$5,939 48,482 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $303 Cost: $85 |
$230 | 1,874 | $73 | 8 | - | - |
$230 1,874 kWh |
$73 8 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $3,351 Cost: $1,069 |
$378 | 3,090 | - | - | $2,973 | 180 |
$378 3,090 kWh |
- - kW-months/year |
$2,973 180 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $822 Cost: $334 |
$748 | 6,103 | $74 | 8 | - | - |
$748 6,103 kWh |
$74 8 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $863 Cost: $905 |
- | - | - | - | $863 | 52 |
- - kWh |
- - kW-months/year |
$863 52 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,539 Cost: $5,175 |
$3,539 | 28,889 | - | - | - | - |
$3,539 28,889 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $2,486 Cost: $9,050 |
$2,255 | 18,404 | $231 | 26 | - | - |
$2,255 18,404 kWh |
$231 26 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $6,111 Cost: $42,120 |
$6,111 | 49,882 | - | - | - | - |
$6,111 49,882 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,035 Cost: $60,324 |
$35,821 | 292,404 | $378 | 43 | $3,836 | 232 | $35,821 292,404 kWh |
$378 43 kW-months/year |
$3,836 232 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,446 Cost: $11,443 |
$20,232 | 165,151 | $378 | 43 | $3,836 | 232 | $20,232 165,151 kWh |
$378 43 kW-months/year |
$3,836 232 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||