IAC logo
IAC Assessment: SF0601
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0601
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2023
Principal Product Goat Cheese
NAICS 311513 - Cheese Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 24,000
Annual Production 1,800,000 Pounds
Production Hrs. Annual 2,652
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,869 293,942 kWh $0.19
Electricity Demand $95,965 2,620 kW-months/year $36.63
Electricity Fees $2,186 - $ -
Natural Gas $101,713 5,859 MMBtu $17.36
TOTAL ENERGY COSTS $254,733
RECOMMENDED SAVINGS* $73,021 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,522
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$35,057
Cost:
-
$26,354 141,157 $8,703 238 - - $26,354
141,157
kWh
$8,703
238
kW-months/year
-
-
MMBtu
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$1,168
Cost:
$200
- - - - $1,168 67 -
-
kWh
-
-
kW-months/year
$1,168
67
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$402
Cost:
$80
$314 1,680 $88 2 - - $314
1,680
kWh
$88
2
kW-months/year
-
-
MMBtu
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$3,765
Cost:
$1,482
- - - - $3,765 217 -
-
kWh
-
-
kW-months/year
$3,765
217
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,103
Cost:
$2,861
$5,103 27,335 - - - - $5,103
27,335
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,700
Cost:
$12,525
$14,700 78,736 - - - - $14,700
78,736
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$12,826
Cost:
$62,630
- - - - $12,826 737 -
-
kWh
-
-
kW-months/year
$12,826
737
MMBtu
TOTAL RECOMMENDED Savings:
$73,021
Cost:
$79,778
$46,471 248,908 $8,791 240 $17,759 1,021 $46,471
248,908
kWh
$8,791
240
kW-months/year
$17,759
1,021
MMBtu
TOTAL IMPLEMENTED Savings:
$53,522
Cost:
$14,007
$41,054 219,893 $8,703 238 $3,765 217 $41,054
219,893
kWh
$8,703
238
kW-months/year
$3,765
217
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas