IAC Assessment: SF0602
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0602
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2023
Principal Product Treated Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 17,000,000
Annual Production 2,555,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $210,648 956,713 kWh $0.22
Electricity Fees $63,767 - $ -
Natural Gas $199,851 17,510 MMBtu $11.41
TOTAL ENERGY COSTS $474,266
RECOMMENDED SAVINGS* $98,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,247
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$632
Cost:
-
$632 2,868 - - $632
2,868
kWh
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,182
Cost:
$1,800
$15,182 68,884 - - $15,182
68,884
kWh
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$8,138
Cost:
$2,126
$8,138 36,941 - - $8,138
36,941
kWh
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$37,571
Cost:
$47,276
$37,571 170,546 - - $37,571
170,546
kWh
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$31,205
Cost:
$105,364
$20,693 93,931 $10,512 - $20,693
93,931
kWh
$10,512
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$6,247
Cost:
$30,019
$6,247 28,359 - - $6,247
28,359
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$98,975
Cost:
$186,585
$88,463 401,529 $10,512 - $88,463
401,529
kWh
$10,512
-
$
TOTAL IMPLEMENTED Savings:
$6,247
Cost:
$30,019
$6,247 28,359 - - $6,247
28,359
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes