IAC logo
IAC Assessment: SF0603
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0603
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2023
Principal Product Concrete Products
NAICS 327331 - Concrete Block and Brick Manufacturing
SIC 3271 - Concrete Block And Brick
Sales $50,000,000-$100,000,000
# of Employees 108
Plant Area (Sq.Ft.) 973,473
Annual Production 35,000,000 Units
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $731,758 5,334,236 kWh $0.14
Electricity Demand $379,856 11,376 kW-months/year $33.39
Natural Gas $867,081 62,633 MMBtu $13.84
Other Gas $231,581 6,700 MMBtu $34.56
TOTAL ENERGY COSTS $2,210,276
RECOMMENDED SAVINGS* $619,632 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,936
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,450
Cost:
$120
$1,089 7,917 $361 11 - - - - - - $1,089
7,917
kWh
$361
11
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,983
Cost:
$141
$1,462 10,630 $521 16 - - - - - - $1,462
10,630
kWh
$521
16
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,760
Cost:
$1,440
$7,760 56,441 - - - - - - - - $7,760
56,441
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,008
Cost:
$7,651
$4,008 29,153 - - - - - - - - $4,008
29,153
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,805
Cost:
$9,018
$3,805 27,673 - - - - - - - - $3,805
27,673
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$31,772
Cost:
$124,644
- - - - $31,772 2,296 - - - - -
-
kWh
-
-
kW-months/year
$31,772
2,296
MMBtu
-
-
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$608
Cost:
$2,572
- - - - $608 45 - - - - -
-
kWh
-
-
kW-months/year
$608
45
MMBtu
-
-
MMBtu
-
-
$
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$568,246
Cost:
$3,565,479
$(-86,575) (-629,635) $(-40,080) (-1,200) - - $231,581 6,700 $463,320 - $(-86,575)
(-629,635)
kWh
$(-40,080)
(-1,200)
kW-months/year
-
-
MMBtu
$231,581
6,700
MMBtu
$463,320
-
$
TOTAL RECOMMENDED Savings:
$619,632
Cost:
$3,711,065
$(-68,451) (-497,821) $(-39,198) (-1,174) $32,380 2,341 $231,581 6,700 $463,320 - $(-68,451)
(-497,821)
kWh
$(-39,198)
(-1,174)
kW-months/year
$32,380
2,341
MMBtu
$231,581
6,700
MMBtu
$463,320
-
$
TOTAL IMPLEMENTED Savings:
$49,936
Cost:
$145,466
$17,035 123,897 $521 16 $32,380 2,341 - - - - $17,035
123,897
kWh
$521
16
kW-months/year
$32,380
2,341
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Other Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Gas One-time Revenue or Avoided Cost