IAC Assessment: SF0606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2023
Principal Product Pudding
NAICS 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 107
Plant Area (Sq.Ft.) 140,000
Annual Production 28,000,000 Pounds
Production Hrs. Annual 5,100
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $346,498 3,448,916 kWh $0.10
Electricity Demand $96,024 8,446 kW-months/year $11.37
Natural Gas $213,533 13,587 MMBtu $15.72
TOTAL ENERGY COSTS $656,055
RECOMMENDED SAVINGS* $151,552 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,495
Cost:
$1,440
$15,495 154,182 - - $15,495
154,182
kWh
-
-
MMBtu
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$5,475
Cost:
$60
- - $5,475 348 -
-
kWh
$5,475
348
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,107
Cost:
$564
- - $1,107 70 -
-
kWh
$1,107
70
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,279
Cost:
$5,910
- - $5,279 336 -
-
kWh
$5,279
336
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,502
Cost:
$8,173
$4,502 44,796 - - $4,502
44,796
kWh
-
-
MMBtu
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$7,028
Cost:
$31,579
- - $7,028 447 -
-
kWh
$7,028
447
MMBtu
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$112,666
Cost:
$923,010
$112,666 1,121,052 - - $112,666
1,121,052
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$151,552
Cost:
$970,736
$132,663 1,320,030 $18,889 1,202 $132,663
1,320,030
kWh
$18,889
1,202
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas