Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2023 |
Principal Product | Red wine, white wine, sparkling wine base |
NAICS | 312130 - Wineries |
SIC | 2084 - Wines, Brandy, And Brandy Spirits |
Sales | $50,000,000-$100,000,000 |
# of Employees | 56 |
Plant Area (Sq.Ft.) | 350,000 |
Annual Production | 2,960 Thousand Gallons |
Production Hrs. Annual | 2,784 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $412,034 | 1,422,792 | kWh | $0.29 |
Natural Gas | $240,385 | 13,878 | MMBtu | $17.32 |
TOTAL ENERGY COSTS | $652,419 | |||
RECOMMENDED SAVINGS* | $554,106 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $116,084 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $12,048 Cost: $1,594 |
$12,048 | 41,660 | - | - | - | - | - | - |
$12,048 41,660 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,389 Cost: $1,640 |
$14,229 | 49,135 | - | - | - | - | $(-3,840) | - |
$14,229 49,135 kWh |
- - $ |
- - MMBtu |
$(-3,840) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,473 Cost: $338 |
- | - | - | - | $1,473 | 85 | - | - |
- - kWh |
- - $ |
$1,473 85 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,090 Cost: $2,155 |
$3,090 | 10,672 | - | - | - | - | - | - |
$3,090 10,672 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $32,617 Cost: $36,367 |
$32,617 | 112,628 | - | - | - | - | - | - |
$32,617 112,628 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $56,467 Cost: $66,447 |
$56,467 | 194,894 | - | - | - | - | - | - |
$56,467 194,894 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $8,652 Cost: $21,442 |
$8,652 | 29,876 | - | - | - | - | - | - |
$8,652 29,876 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,153 Cost: $9,827 |
$3,153 | 10,888 | - | - | - | - | - | - |
$3,153 10,888 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR |
Savings: $426,217 Cost: $1,338,900 |
$474,069 | 1,636,980 | $(-40,000) | - | - | - | $(-7,852) | - |
$474,069 1,636,980 kWh |
$(-40,000) - $ |
- - MMBtu |
$(-7,852) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $554,106 Cost: $1,478,710 |
$604,325 | 2,086,733 | $(-40,000) | - | $1,473 | 85 | $(-11,692) | - | $604,325 2,086,733 kWh |
$(-40,000) - $ |
$1,473 85 MMBtu |
$(-11,692) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $116,084 Cost: $108,541 |
$118,451 | 408,989 | - | - | $1,473 | 85 | $(-3,840) | - | $118,451 408,989 kWh |
- - $ |
$1,473 85 MMBtu |
$(-3,840) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes |