Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2024
Principal Product Whipped cream cans, purity cups (creamers), milk, ice cream mix
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 167,500
Annual Production 60,000,000 Units
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,898,556 17,662,810 kWh $0.11
Electricity Demand $1,261,288 30,326 kW-months/year $41.59
Electricity Fees $22,293 - $ -
Natural Gas $1,859,929 169,695 MMBtu $10.96
TOTAL ENERGY COSTS $5,042,066
RECOMMENDED SAVINGS* $256,801 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,215
Cost:
-
$18,335 170,563 - - $(-1,120) - - - $18,335
170,563
kWh
-
-
MMBtu
$(-1,120)
-
$
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$12,954
Cost:
-
- - $14,074 1,284 $(-1,120) - - - -
-
kWh
$14,074
1,284
MMBtu
$(-1,120)
-
$
-
-
$
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$32,003
Cost:
$15,909
- - $32,003 2,920 - - - - -
-
kWh
$32,003
2,920
MMBtu
-
-
$
-
-
$
04: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$36,485
Cost:
$30,037
- - $36,485 3,329 - - - - -
-
kWh
$36,485
3,329
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,683
Cost:
$31,050
$31,683 294,724 - - - - - - $31,683
294,724
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,502
Cost:
$10,799
$7,441 69,222 - - $214 - $847 - $7,441
69,222
kWh
-
-
MMBtu
$214
-
$
$847
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$32,191
Cost:
$83,238
$32,191 299,455 - - - - - - $32,191
299,455
kWh
-
-
MMBtu
-
-
$
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$85,768
Cost:
$772,344
$85,768 797,842 - - - - - - $85,768
797,842
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$256,801
Cost:
$943,377
$175,418 1,631,806 $82,562 7,533 $(-2,026) - $847 - $175,418
1,631,806
kWh
$82,562
7,533
MMBtu
$(-2,026)
-
$
$847
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost