Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2024 |
Principal Product | Whipped cream cans, purity cups (creamers), milk, ice cream mix |
NAICS | 311511 - Fluid Milk Manufacturing |
SIC | 2026 - Fluid Milk |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 167,500 |
Annual Production | 60,000,000 Units |
Production Hrs. Annual | 8,760 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,898,556 | 17,662,810 | kWh | $0.11 |
Electricity Demand | $1,261,288 | 30,326 | kW-months/year | $41.59 |
Electricity Fees | $22,293 | - | $ | - |
Natural Gas | $1,859,929 | 169,695 | MMBtu | $10.96 |
TOTAL ENERGY COSTS | $5,042,066 | |||
RECOMMENDED SAVINGS* | $256,801 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $138,842 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $17,215 Cost: - |
$18,335 | 170,563 | - | - | $(-1,120) | - | - | - |
$18,335 170,563 kWh |
- - MMBtu |
$(-1,120) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $12,954 Cost: - |
- | - | $14,074 | 1,284 | $(-1,120) | - | - | - |
- - kWh |
$14,074 1,284 MMBtu |
$(-1,120) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $32,003 Cost: $15,909 |
- | - | $32,003 | 2,920 | - | - | - | - |
- - kWh |
$32,003 2,920 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2447 HEAT WATER WITH EXHAUST HEAT |
Savings: $36,485 Cost: $30,037 |
- | - | $36,485 | 3,329 | - | - | - | - |
- - kWh |
$36,485 3,329 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $31,683 Cost: $31,050 |
$31,683 | 294,724 | - | - | - | - | - | - |
$31,683 294,724 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $8,502 Cost: $10,799 |
$7,441 | 69,222 | - | - | $214 | - | $847 | - |
$7,441 69,222 kWh |
- - MMBtu |
$214 - $ |
$847 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $32,191 Cost: $83,238 |
$32,191 | 299,455 | - | - | - | - | - | - |
$32,191 299,455 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $85,768 Cost: $772,344 |
$85,768 | 797,842 | - | - | - | - | - | - |
$85,768 797,842 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $256,801 Cost: $943,377 |
$175,418 | 1,631,806 | $82,562 | 7,533 | $(-2,026) | - | $847 | - | $175,418 1,631,806 kWh |
$82,562 7,533 MMBtu |
$(-2,026) - $ |
$847 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $138,842 Cost: $87,795 |
$57,459 | 534,509 | $82,562 | 7,533 | $(-2,026) | - | $847 | - | $57,459 534,509 kWh |
$82,562 7,533 MMBtu |
$(-2,026) - $ |
$847 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost |