IAC Assessment: SF0611
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0611
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2024
Principal Product Almonds
NAICS 311911 - Roasted Nuts and Peanut Butter Manufacturing
SIC 2068 - Salted And Roasted Nuts And Seeds
Sales >$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 252,000
Annual Production 438,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,407,697 14,445,517 kWh $0.10
Electricity Demand $379,609 34,187 kW-months/year $11.10
Natural Gas $1,229,723 126,184 MMBtu $9.75
TOTAL ENERGY COSTS $3,017,029
RECOMMENDED SAVINGS* $262,301 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $247,039
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$14,817
Cost:
-
$14,817 152,129 - - $14,817
152,129
kWh
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,908
Cost:
-
$4,908 50,394 - - $4,908
50,394
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$61,975
Cost:
$1,800
$61,975 639,299 - - $61,975
639,299
kWh
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,353
Cost:
$2,100
$6,353 65,229 - - $6,353
65,229
kWh
-
-
MMBtu
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$8,909
Cost:
$18,675
- - $8,909 914 -
-
kWh
$8,909
914
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$165,339
Cost:
$1,651,070
$165,339 1,697,522 - - $165,339
1,697,522
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$262,301
Cost:
$1,673,645
$253,392 2,604,573 $8,909 914 $253,392
2,604,573
kWh
$8,909
914
MMBtu
TOTAL IMPLEMENTED Savings:
$247,039
Cost:
$1,652,870
$247,039 2,539,344 - - $247,039
2,539,344
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas