IAC logo
IAC Assessment: SJ0001
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0001
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2023
Principal Product Machined metal parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 24,000
Annual Production 1,000 Units
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,629 620,692 kWh $0.27
Electricity Demand $20,532 1,196 kW-months/year $17.16
Natural Gas $2,677 128 MMBtu $20.88
TOTAL ENERGY COSTS $193,838
RECOMMENDED SAVINGS* $70,852 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$58,845
Cost:
$236,368
$55,516 224,218 $3,329 194 - - - - $55,516
224,218
kWh
$3,329
194
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,201
Cost:
-
$2,045 8,258 $156 9 - - - - $2,045
8,258
kWh
$156
9
kW-months/year
-
-
$
-
-
MMBtu
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,541
Cost:
-
- - - - $6,541 - - - -
-
kWh
-
-
kW-months/year
$6,541
-
$
-
-
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$480
Cost:
-
- - - - - - $480 24 -
-
kWh
-
-
kW-months/year
-
-
$
$480
24
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,785
Cost:
$1,200
$2,785 11,232 - - - - - - $2,785
11,232
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$70,852
Cost:
$237,568
$60,346 243,708 $3,485 203 $6,541 - $480 24 $60,346
243,708
kWh
$3,485
203
kW-months/year
$6,541
-
$
$480
24
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas