Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Aluminum and Copper Alloy Metal Castings
NAICS n/a
SIC 3362 -
Sales $1,000,000-$5,000,000
# of Employees 22
Plant Area (Sq.Ft.) 50,000
Annual Production 197,417 Pounds
Production Hrs. Annual 2,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,183 151,524 kWh $0.07
Electricity Demand $8,526 1,025 kW-months/year $8.32
Electricity Fees $1,387 - $ -
Natural Gas $13,364 1,839 MMBtu $7.27
Fuel Oil #2 $15,191 2,156 MMBtu $7.05
TOTAL ENERGY COSTS $49,651
RECOMMENDED SAVINGS* $38,575 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,899
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Ancillary Material Cost Electricity Usage Fuel Oil #2 Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 3.5221 RECYCLE CASTING SAND Savings:
$35,529
Cost:
$45,000
- - - - $35,529 - -
-
kWh
-
-
MMBtu
$35,529
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$370
Cost:
-
$370 5,275 - - - - $370
5,275
kWh
-
-
MMBtu
-
-
$
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$176
Cost:
$253
- - $176 24 - - -
-
kWh
$176
24
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,500
Cost:
$8,350
$2,500 33,998 - - - - $2,500
33,998
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$38,575
Cost:
$53,603
$2,870 39,273 $176 24 $35,529 - $2,870
39,273
kWh
$176
24
MMBtu
$35,529
-
$
TOTAL IMPLEMENTED Savings:
$35,899
Cost:
$45,000
$370 5,275 - - $35,529 - $370
5,275
kWh
-
-
MMBtu
$35,529
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Ancillary Material Cost Electricity Usage Fuel Oil #2 Ancillary Material Cost