IAC logo
IAC Assessment: SU0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Theatrical Rigging Equipment
NAICS n/a
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 20,000
Annual Production 0 Units
Production Hrs. Annual 2,210
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,534 185,015 kWh $0.07
Electricity Demand $8,999 1,082 kW-months/year $8.32
Electricity Fees $1,378 - $ -
Natural Gas $7,719 1,081 MMBtu $7.14
TOTAL ENERGY COSTS $31,630
RECOMMENDED SAVINGS* $183,832 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,673
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Increase in Production Electricity Usage Natural Gas Primary Product Increase in Production
$ kWh $ MMBtu $ $ $ %
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$48
Cost:
-
$48 - - - - - - - $48
-
kWh
-
-
MMBtu
-
-
$
-
-
%
02: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$4,867
Cost:
$234
- - - - - - $4,867 - -
-
kWh
-
-
MMBtu
-
-
$
$4,867
-
%
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$758
Cost:
$1,323
- - $758 118 - - - - -
-
kWh
$758
118
MMBtu
-
-
$
-
-
%
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$231
Cost:
$250
$231 3,104 - - - - - - $231
3,104
kWh
-
-
MMBtu
-
-
$
-
-
%
05: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$30,000
Cost:
$34,762
- - - - $30,000 - - - -
-
kWh
-
-
MMBtu
$30,000
-
$
-
-
%
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$189
Cost:
$244
$189 3,435 - - - - - - $189
3,435
kWh
-
-
MMBtu
-
-
$
-
-
%
07: 4.426 MODIFY WORKLOAD Savings:
$147,739
Cost:
$201
- - - - $147,739 - - - -
-
kWh
-
-
MMBtu
$147,739
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$183,832
Cost:
$37,014
$468 6,539 $758 118 $177,739 - $4,867 - $468
6,539
kWh
$758
118
MMBtu
$177,739
-
$
$4,867
-
%
TOTAL IMPLEMENTED Savings:
$5,673
Cost:
$1,557
$48 - $758 118 - - $4,867 - $48
-
kWh
$758
118
MMBtu
-
-
$
$4,867
-
%
Savings
Cost
$ kWh $ MMBtu $ $ $ %
Electricity Usage Natural Gas Primary Product Increase in Production Electricity Usage Natural Gas Primary Product Increase in Production