IAC logo
IAC Assessment: SU0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Candles
NAICS n/a
SIC 3999 - Manufacturing Industries, Nec
Sales $5,000,000-$10,000,000
# of Employees 49
Plant Area (Sq.Ft.) 36,000
Annual Production 0 Units
Production Hrs. Annual 1,920
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,847 364,120 kWh $0.06
Electricity Demand $26,700 1,784 kW-months/year $14.97
Electricity Fees $3,122 - $ -
Natural Gas $43,837 5,745 MMBtu $7.63
TOTAL ENERGY COSTS $95,506
RECOMMENDED SAVINGS* $38,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,880
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,365
Cost:
-
- - - - - - $1,365 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,365
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,285
Cost:
$38
- - - - $1,285 169 - - -
-
kWh
-
-
kW-months/year
$1,285
169
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$993
Cost:
$123
- - - - $993 132 - - -
-
kWh
-
-
kW-months/year
$993
132
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$258
Cost:
-
$258 4,296 - - - - - - $258
4,296
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$264
Cost:
$90
$261 4,355 $3 - - - - - $261
4,355
kWh
$3
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$34,064
Cost:
$380,000
$21,847 364,120 $22,723 1,783 $(-10,506) (-13,824) - - $21,847
364,120
kWh
$22,723
1,783
kW-months/year
$(-10,506)
(-13,824)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$38,229
Cost:
$380,251
$22,366 372,771 $22,726 1,783 $(-8,228) (-13,523) $1,365 - $22,366
372,771
kWh
$22,726
1,783
kW-months/year
$(-8,228)
(-13,523)
MMBtu
$1,365
-
$
TOTAL IMPLEMENTED Savings:
$2,880
Cost:
$213
$519 8,651 $3 - $993 132 $1,365 - $519
8,651
kWh
$3
-
kW-months/year
$993
132
MMBtu
$1,365
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes