IAC logo
IAC Assessment: SU0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Electroplated and anodized parts
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 57,000
Annual Production 100,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $308,830 5,569,200 kWh $0.06
Electricity Demand $122,655 10,410 kW-months/year $11.78
Electricity Fees $42,787 - $ -
Natural Gas $297,239 70,747 MMBtu $4.20
TOTAL ENERGY COSTS $771,511
RECOMMENDED SAVINGS* $420,806 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,452
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,051
Cost:
-
- - - - - - - - $10,051 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$10,051
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$399,407
Cost:
$1,400,000
$308,830 5,569,294 $122,655 10,410 $42,787 - $(-74,865) (-17,827) - - $308,830
5,569,294
kWh
$122,655
10,410
kW-months/year
$42,787
-
$
$(-74,865)
(-17,827)
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,947
Cost:
$2,241
$1,947 20,216 - - - - - - - - $1,947
20,216
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,158
Cost:
$500
- - - - - - $6,158 1,466 - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,158
1,466
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,243
Cost:
$10,210
$3,243 32,229 - - - - - - - - $3,243
32,229
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$420,806
Cost:
$1,412,951
$314,020 5,621,739 $122,655 10,410 $42,787 - $(-68,707) (-16,361) $10,051 - $314,020
5,621,739
kWh
$122,655
10,410
kW-months/year
$42,787
-
$
$(-68,707)
(-16,361)
MMBtu
$10,051
-
$
TOTAL IMPLEMENTED Savings:
$19,452
Cost:
$10,710
$3,243 32,229 - - - - $6,158 1,466 $10,051 - $3,243
32,229
kWh
-
-
kW-months/year
-
-
$
$6,158
1,466
MMBtu
$10,051
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost