Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2001 |
Principal Product | Ceramic Dinnerware |
NAICS | n/a |
SIC | 3299 - Nonmetallic Mineral Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 660,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $378,388 | 13,708,963 | kWh | $0.03 |
Electricity Demand | $336,830 | 31,204 | kW-months/year | $10.79 |
Electricity Fees | $51,608 | - | $ | - |
Natural Gas | $1,710,849 | 422,656 | MMBtu | $4.05 |
TOTAL ENERGY COSTS | $2,477,675 | |||
RECOMMENDED SAVINGS* | $73,559 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8112 COMBINE UTILITY METERS |
Savings: $5,085 Cost: - |
- | - | - | - | $5,085 | - | - | - |
- - kWh |
- - kW-months/year |
$5,085 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $13,180 Cost: $2,241 |
$13,180 | 183,763 | - | - | - | - | - | - |
$13,180 183,763 kWh |
- - kW-months/year |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4151 MINIMIZE WATER USAGE |
Savings: $51,680 Cost: $1,605 |
- | - | - | - | - | - | $51,680 | 54,642,000 |
- - kWh |
- - kW-months/year |
- - $ |
$51,680 54,642,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,023 Cost: $90 |
$1,257 | 41,911 | $766 | 63 | - | - | - | - |
$1,257 41,911 kWh |
$766 63 kW-months/year |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7122 DISCONNECT BALLASTS |
Savings: $65 Cost: - |
$22 | 879 | $43 | 4 | - | - | - | - |
$22 879 kWh |
$43 4 kW-months/year |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,526 Cost: $3,780 |
- | - | - | - | $1,526 | - | - | - |
- - kWh |
- - kW-months/year |
$1,526 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $73,559 Cost: $7,716 |
$14,459 | 226,553 | $809 | 67 | $6,611 | - | $51,680 | 54,642,000 | $14,459 226,553 kWh |
$809 67 kW-months/year |
$6,611 - $ |
$51,680 54,642,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal |