Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2001 |
Principal Product | Industrial Process Equipment |
NAICS | n/a |
SIC | 3532 - Mining Machinery |
Sales | $1,000,000-$5,000,000 |
# of Employees | 37 |
Plant Area (Sq.Ft.) | 43,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 2,860 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $29,139 | 734,299 | kWh | $0.04 |
Electricity Demand | $22,155 | 2,514 | kW-months/year | $8.81 |
Electricity Fees | $9,154 | - | $ | - |
Natural Gas | $13,141 | 1,989 | MMBtu | $6.61 |
TOTAL ENERGY COSTS | $73,589 | |||
RECOMMENDED SAVINGS* | $36,706 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,818 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $26,000 Cost: $24,320 |
- | - | - | - | - | - | - | - | $26,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$26,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $508 Cost: - |
$508 | 12,799 | - | - | - | - | - | - | - | - |
$508 12,799 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $4,310 Cost: $30 |
$2,407 | 60,174 | $1,903 | 216 | - | - | - | - | - | - |
$2,407 60,174 kWh |
$1,903 216 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,977 Cost: $1,030 |
$391 | 9,781 | - | - | $1,586 | 240 | - | - | - | - |
$391 9,781 kWh |
- - kW-months/year |
$1,586 240 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $88 Cost: $115 |
$88 | 2,202 | - | - | - | - | - | - | - | - |
$88 2,202 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $3,823 Cost: $6,930 |
- | - | - | - | - | - | $3,823 | 187 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,823 187 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,706 Cost: $32,425 |
$3,394 | 84,956 | $1,903 | 216 | $1,586 | 240 | $3,823 | 187 | $26,000 | - | $3,394 84,956 kWh |
$1,903 216 kW-months/year |
$1,586 240 MMBtu |
$3,823 187 gal |
$26,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,818 Cost: $30 |
$2,915 | 72,973 | $1,903 | 216 | - | - | - | - | - | - | $2,915 72,973 kWh |
$1,903 216 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes |