IAC logo
IAC Assessment: SU0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Industrial Process Equipment
NAICS n/a
SIC 3532 - Mining Machinery
Sales $1,000,000-$5,000,000
# of Employees 37
Plant Area (Sq.Ft.) 43,000
Annual Production 0 Pieces
Production Hrs. Annual 2,860
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,139 734,299 kWh $0.04
Electricity Demand $22,155 2,514 kW-months/year $8.81
Electricity Fees $9,154 - $ -
Natural Gas $13,141 1,989 MMBtu $6.61
TOTAL ENERGY COSTS $73,589
RECOMMENDED SAVINGS* $36,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,818
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$26,000
Cost:
$24,320
- - - - - - - - $26,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$26,000
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$508
Cost:
-
$508 12,799 - - - - - - - - $508
12,799
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,310
Cost:
$30
$2,407 60,174 $1,903 216 - - - - - - $2,407
60,174
kWh
$1,903
216
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,977
Cost:
$1,030
$391 9,781 - - $1,586 240 - - - - $391
9,781
kWh
-
-
kW-months/year
$1,586
240
MMBtu
-
-
gal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$88
Cost:
$115
$88 2,202 - - - - - - - - $88
2,202
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$3,823
Cost:
$6,930
- - - - - - $3,823 187 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,823
187
gal
-
-
$
TOTAL RECOMMENDED Savings:
$36,706
Cost:
$32,425
$3,394 84,956 $1,903 216 $1,586 240 $3,823 187 $26,000 - $3,394
84,956
kWh
$1,903
216
kW-months/year
$1,586
240
MMBtu
$3,823
187
gal
$26,000
-
$
TOTAL IMPLEMENTED Savings:
$4,818
Cost:
$30
$2,915 72,973 $1,903 216 - - - - - - $2,915
72,973
kWh
$1,903
216
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes