IAC Assessment: SU0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Plastic automotive parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 75,047
Annual Production 22,041,827 Pieces
Production Hrs. Annual 5,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $426,490 7,022,274 kWh $0.06
Electricity Demand $183,914 13,975 kW-months/year $13.16
Electricity Fees $36,000 - $ -
Natural Gas $125,423 36,939 MMBtu $3.40
TOTAL ENERGY COSTS $771,827
RECOMMENDED SAVINGS* $176,310 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,915
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,222
Cost:
-
$3,222 107,380 - - - - - - $3,222
107,380
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,645
Cost:
$225
$900 30,188 $745 56 - - - - $900
30,188
kWh
$745
56
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,834
Cost:
-
$4,834 161,130 - - - - - - $4,834
161,130
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$64,282
Cost:
$500,000
$87,091 2,903,040 - - $(-22,809) (-12,672) - - $87,091
2,903,040
kWh
-
-
kW-months/year
$(-22,809)
(-12,672)
MMBtu
-
-
Tgal
05: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$81,279
Cost:
$750,000
- - - - $81,279 36,156 - - -
-
kWh
-
-
kW-months/year
$81,279
36,156
MMBtu
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$80
Cost:
-
$80 2,685 - - - - - - $80
2,685
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,188
Cost:
$8,325
- - - - $6,188 3,438 - - -
-
kWh
-
-
kW-months/year
$6,188
3,438
MMBtu
-
-
Tgal
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$14,780
Cost:
$9,400
- - - - - - $14,780 1,000,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,780
1,000,000
Tgal
TOTAL RECOMMENDED Savings:
$176,310
Cost:
$1,267,950
$96,127 3,204,423 $745 56 $64,658 26,922 $14,780 1,000,000 $96,127
3,204,423
kWh
$745
56
kW-months/year
$64,658
26,922
MMBtu
$14,780
1,000,000
Tgal
TOTAL IMPLEMENTED Savings:
$25,915
Cost:
$17,950
$4,202 140,253 $745 56 $6,188 3,438 $14,780 1,000,000 $4,202
140,253
kWh
$745
56
kW-months/year
$6,188
3,438
MMBtu
$14,780
1,000,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal