IAC Assessment: SU0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Copper Wire
NAICS n/a
SIC 3351 - Copper Rolling And Drawing
Sales n/a
# of Employees 190
Plant Area (Sq.Ft.) 140,000
Annual Production 0 Units
Production Hrs. Annual 7,488
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,470,108 35,126,948 kWh $0.04
Electricity Demand $153,399 50,160 kW-months/year $3.06
Electricity Fees $333,607 - $ -
Natural Gas $15,310 11,941 MMBtu $1.28
TOTAL ENERGY COSTS $1,982,424
RECOMMENDED SAVINGS* $191,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,501
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$7,264
Cost:
$8,085
$7,264 172,966 - - - - - - $7,264
172,966
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$768
Cost:
-
$580 13,800 $188 2 - - - - $580
13,800
kWh
$188
2
kW-months/year
-
-
$
-
-
$
03: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$153,410
Cost:
$531,678
- - - - - - $153,410 - -
-
kWh
-
-
kW-months/year
-
-
$
$153,410
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,307
Cost:
$30,550
- - - - $12,307 - - - -
-
kWh
-
-
kW-months/year
$12,307
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,845
Cost:
$158
$3,845 91,559 - - - - - - $3,845
91,559
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,016
Cost:
-
$3,016 71,810 - - - - - - $3,016
71,810
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,888
Cost:
$20,600
$10,888 259,227 - - - - - - $10,888
259,227
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$191,498
Cost:
$591,071
$25,593 609,362 $188 2 $12,307 - $153,410 - $25,593
609,362
kWh
$188
2
kW-months/year
$12,307
-
$
$153,410
-
$
TOTAL IMPLEMENTED Savings:
$15,501
Cost:
$20,758
$15,313 364,586 $188 2 - - - - $15,313
364,586
kWh
$188
2
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes