IAC logo
IAC Assessment: SU0118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Hydraulic Valves
NAICS n/a
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 62,700
Annual Production 0 Units
Production Hrs. Annual 4,784
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,796 1,135,970 kWh $0.06
Electricity Demand $44,282 3,490 kW-months/year $12.69
Electricity Fees $3,930 - $ -
Natural Gas $12,024 1,514 MMBtu $7.94
TOTAL ENERGY COSTS $134,032
RECOMMENDED SAVINGS* $33,791 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $392
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Water Consumption Electricity Usage Electricity Demand Personnel Changes Water Consumption
$ kWh $ kW-months/year $ $ $ Tgal
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,949
Cost:
$30
$6,924 77,954 $2,025 160 - - - - $6,924
77,954
kWh
$2,025
160
kW-months/year
-
-
$
-
-
Tgal
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$392
Cost:
-
$392 6,029 - - - - - - $392
6,029
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$120
Cost:
$158
$120 1,839 - - - - - - $120
1,839
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$3,469
Cost:
$16,370
- - - - - - $3,469 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,469
-
Tgal
05: 4.452 ELIMINATE SHIFT Savings:
$20,861
Cost:
-
$10,721 152,256 - - $10,140 - - - $10,721
152,256
kWh
-
-
kW-months/year
$10,140
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$33,791
Cost:
$16,558
$18,157 238,078 $2,025 160 $10,140 - $3,469 - $18,157
238,078
kWh
$2,025
160
kW-months/year
$10,140
-
$
$3,469
-
Tgal
TOTAL IMPLEMENTED Savings:
$392
Cost:
-
$392 6,029 - - - - - - $392
6,029
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal
Electricity Usage Electricity Demand Personnel Changes Water Consumption Electricity Usage Electricity Demand Personnel Changes Water Consumption