IAC Assessment: SU0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product airport lighting supports, BMF concrete forms
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales n/a
# of Employees 86
Plant Area (Sq.Ft.) 120,283
Annual Production 67,212 Pieces
Production Hrs. Annual 3,024
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,068 1,123,500 kWh $0.06
Electricity Demand $61,559 4,851 kW-months/year $12.69
Electricity Fees $11,271 - $ -
Natural Gas $70,258 12,790 MMBtu $5.49
TOTAL ENERGY COSTS $212,156
RECOMMENDED SAVINGS* $89,925 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,437
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,410
Cost:
-
$1,410 23,513 - - - - $1,410
23,513
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$930
Cost:
-
$930 15,500 - - - - $930
15,500
kWh
-
-
MMBtu
-
-
$
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$5,956
Cost:
$4,900
- - $5,956 1,085 - - -
-
kWh
$5,956
1,085
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,095
Cost:
$727
- - $2,095 381 - - -
-
kWh
$2,095
381
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$30,661
Cost:
$208,950
- - $30,661 5,584 - - -
-
kWh
$30,661
5,584
MMBtu
-
-
$
06: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$46,417
Cost:
$15,500
- - - - $46,417 - -
-
kWh
-
-
MMBtu
$46,417
-
$
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$2,456
Cost:
-
- - - - $2,456 - -
-
kWh
-
-
MMBtu
$2,456
-
$
TOTAL RECOMMENDED Savings:
$89,925
Cost:
$230,077
$2,340 39,013 $38,712 7,050 $48,873 - $2,340
39,013
kWh
$38,712
7,050
MMBtu
$48,873
-
$
TOTAL IMPLEMENTED Savings:
$11,437
Cost:
$5,627
$930 15,500 $8,051 1,466 $2,456 - $930
15,500
kWh
$8,051
1,466
MMBtu
$2,456
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes