IAC logo
IAC Assessment: SU0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product bearing assemblies
NAICS n/a
SIC 3562 - Ball And Roller Bearings
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 220,000
Annual Production 130,000 Pieces
Production Hrs. Annual 7,488
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,064 7,764,370 kWh $0.03
Electricity Demand $173,409 25,887 kW-months/year $6.70
Electricity Fees $18,197 - $ -
Natural Gas $393,634 51,376 MMBtu $7.66
TOTAL ENERGY COSTS $796,304
RECOMMENDED SAVINGS* $41,447 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,106
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,106
Cost:
-
- - - - - - - - $1,106 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,106
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,537
Cost:
$8,750
- - - - $2,537 - - - - - -
-
kWh
-
-
kW-months/year
$2,537
-
$
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$188
Cost:
$30
$188 6,268 - - - - - - - - $188
6,268
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$160
Cost:
$840
$118 3,942 $42 6 - - - - - - $118
3,942
kWh
$42
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,600
Cost:
-
$3,600 120,000 - - - - - - - - $3,600
120,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7293 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS Savings:
$21,289
Cost:
$75,000
$540 18,000 $67 10 - - $20,682 2,700 - - $540
18,000
kWh
$67
10
kW-months/year
-
-
$
$20,682
2,700
MMBtu
-
-
$
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$12,567
Cost:
$20,000
$12,567 418,900 - - - - - - - - $12,567
418,900
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$41,447
Cost:
$104,620
$17,013 567,110 $109 16 $2,537 - $20,682 2,700 $1,106 - $17,013
567,110
kWh
$109
16
kW-months/year
$2,537
-
$
$20,682
2,700
MMBtu
$1,106
-
$
TOTAL IMPLEMENTED Savings:
$1,106
Cost:
-
- - - - - - - - $1,106 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,106
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost