IAC logo
IAC Assessment: SU0121
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product electro-mechanical switches
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 229
Plant Area (Sq.Ft.) 71,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,510 2,066,861 kWh $0.05
Electricity Demand $49,865 4,743 kW-months/year $10.51
Electricity Fees $21,029 - $ -
Natural Gas $8,159 997 MMBtu $8.18
TOTAL ENERGY COSTS $187,563
RECOMMENDED SAVINGS* $10,863 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,469
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,756
Cost:
$450
$4,668 89,767 $1,088 104 - - - - $4,668
89,767
kWh
$1,088
104
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$508
Cost:
$945
- - - - $508 62 - - -
-
kWh
-
-
kW-months/year
$508
62
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,001
Cost:
$69
$1,001 19,251 - - - - - - $1,001
19,251
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,452
Cost:
-
$1,452 27,926 - - - - - - $1,452
27,926
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,638
Cost:
$271
- - - - - - $1,638 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,638
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$508
Cost:
$230
$508 9,774 - - - - - - $508
9,774
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,863
Cost:
$1,965
$7,629 146,718 $1,088 104 $508 62 $1,638 - $7,629
146,718
kWh
$1,088
104
kW-months/year
$508
62
MMBtu
$1,638
-
$
TOTAL IMPLEMENTED Savings:
$3,469
Cost:
$1,244
$2,961 56,951 - - $508 62 - - $2,961
56,951
kWh
-
-
kW-months/year
$508
62
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes