IAC logo
IAC Assessment: SU0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product solid state controls
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 31,000
Annual Production 2,313,321 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,581 2,194,240 kWh $0.06
Electricity Demand $84,753 6,566 kW-months/year $12.91
Electricity Fees $10,481 - $ -
Natural Gas $18,707 2,521 MMBtu $7.42
TOTAL ENERGY COSTS $243,522
RECOMMENDED SAVINGS* $34,681 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,144
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,637
Cost:
-
$2,522 42,048 $1,115 86 - - - - $2,522
42,048
kWh
$1,115
86
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$27,282
Cost:
$372,500
$65,580 907,104 $30,915 2,436 $(-69,213) (-9,330) - - $65,580
907,104
kWh
$30,915
2,436
kW-months/year
$(-69,213)
(-9,330)
MMBtu
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,563
Cost:
-
$1,563 26,057 - - - - - - $1,563
26,057
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$55
Cost:
$45
$55 457 - - - - - - $55
457
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,144
Cost:
$9,900
- - - - - - $2,144 7,600,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,144
7,600,000
Tgal
TOTAL RECOMMENDED Savings:
$34,681
Cost:
$382,445
$69,720 975,666 $32,030 2,522 $(-69,213) (-9,330) $2,144 7,600,000 $69,720
975,666
kWh
$32,030
2,522
kW-months/year
$(-69,213)
(-9,330)
MMBtu
$2,144
7,600,000
Tgal
TOTAL IMPLEMENTED Savings:
$2,144
Cost:
$9,900
- - - - - - $2,144 7,600,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,144
7,600,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal