IAC logo
IAC Assessment: SU0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product Boat windshields
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 127
Plant Area (Sq.Ft.) 125,340
Annual Production 20,000 Pieces
Production Hrs. Annual 3,120
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,831 2,473,262 kWh $0.06
Electricity Demand $121,143 8,092 kW-months/year $14.97
Electricity Fees $17,858 - $ -
Natural Gas $50,178 8,683 MMBtu $5.78
TOTAL ENERGY COSTS $344,010
RECOMMENDED SAVINGS* $7,336 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,634
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$151
Cost:
-
$83 1,186 $68 5 - - - - $83
1,186
kWh
$68
5
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$573
Cost:
-
$573 8,182 - - - - - - $573
8,182
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,088
Cost:
-
- - - - $1,088 - - - -
-
kWh
-
-
kW-months/year
$1,088
-
$
-
-
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,141
Cost:
$2,364
- - - - - - $1,141 250 -
-
kWh
-
-
kW-months/year
-
-
$
$1,141
250
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,395
Cost:
-
$1,395 19,929 - - - - - - $1,395
19,929
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,486
Cost:
$7,000
- - - - $1,486 - - - -
-
kWh
-
-
kW-months/year
$1,486
-
$
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,502
Cost:
$1,100
- - - - - - $1,502 258 -
-
kWh
-
-
kW-months/year
-
-
$
$1,502
258
MMBtu
TOTAL RECOMMENDED Savings:
$7,336
Cost:
$10,464
$2,051 29,297 $68 5 $2,574 - $2,643 508 $2,051
29,297
kWh
$68
5
kW-months/year
$2,574
-
$
$2,643
508
MMBtu
TOTAL IMPLEMENTED Savings:
$2,634
Cost:
-
$1,478 21,115 $68 5 $1,088 - - - $1,478
21,115
kWh
$68
5
kW-months/year
$1,088
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas