Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product Wood pallets and boxes
NAICS n/a
SIC 2448 - Wood Pallets And Skids
Sales $1,000,000-$5,000,000
# of Employees 70
Plant Area (Sq.Ft.) 61,509
Annual Production 200,000 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,078 767,550 kWh $0.07
Electricity Demand $46,510 3,417 kW-months/year $13.61
Other Gas $920 60 MMBtu $15.33
TOTAL ENERGY COSTS $97,508
RECOMMENDED SAVINGS* $146,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $524
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood
$ kWh $ kW-months/year $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$217
Cost:
$518
$217 3,103 - - - - $217
3,103
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$307
Cost:
$38
$307 4,386 - - - - $307
4,386
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$442
Cost:
$871
$442 6,317 - - - - $442
6,317
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,614
Cost:
$1,875
$1,763 25,182 $851 63 - - $1,763
25,182
kWh
$851
63
kW-months/year
-
-
MMBtu
05: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$33,055
Cost:
$2,330
$11 162 - - $33,044 68,262 $11
162
kWh
-
-
kW-months/year
$33,044
68,262
MMBtu
06: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$109,460
Cost:
$1,150,000
$53,729 767,560 $55,731 3,417 - - $53,729
767,560
kWh
$55,731
3,417
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$146,095
Cost:
$1,155,632
$56,469 806,710 $56,582 3,480 $33,044 68,262 $56,469
806,710
kWh
$56,582
3,480
kW-months/year
$33,044
68,262
MMBtu
TOTAL IMPLEMENTED Savings:
$524
Cost:
$556
$524 7,489 - - - - $524
7,489
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood