IAC logo
IAC Assessment: SU0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product Electronic Controls
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 285
Plant Area (Sq.Ft.) 26,000
Annual Production 1,600,000 Pieces
Production Hrs. Annual 4,160
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,207 1,056,720 kWh $0.13
Natural Gas $9,850 1,303 MMBtu $7.56
TOTAL ENERGY COSTS $149,057
RECOMMENDED SAVINGS* $20,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,772
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 3.1171 CHANGE PRODUCT SPECS Savings:
$14,930
Cost:
$2,500
- - - - - - $14,930 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,930
-
$
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$2,391
Cost:
$115
- - - - $2,391 316 - - -
-
kWh
-
-
kW-months/year
$2,391
316
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$997
Cost:
$102
- - - - $997 132 - - -
-
kWh
-
-
kW-months/year
$997
132
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$917
Cost:
$115
$639 7,987 $278 23 - - - - $639
7,987
kWh
$278
23
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$775
Cost:
$193
$775 9,696 - - - - - - $775
9,696
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$197
Cost:
-
$197 2,464 - - - - - - $197
2,464
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$20,207
Cost:
$3,025
$1,611 20,147 $278 23 $3,388 448 $14,930 - $1,611
20,147
kWh
$278
23
kW-months/year
$3,388
448
MMBtu
$14,930
-
$
TOTAL IMPLEMENTED Savings:
$1,772
Cost:
$295
$775 9,696 - - $997 132 - - $775
9,696
kWh
-
-
kW-months/year
$997
132
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes