IAC Assessment: SU0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product Thermoformed Plastics
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 28
Plant Area (Sq.Ft.) 40,000
Annual Production 0 Pieces
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,932 1,182,500 kWh $0.09
Electricity Demand $84,439 7,123 kW-months/year $11.85
Natural Gas $33,384 3,255 MMBtu $10.26
TOTAL ENERGY COSTS $223,576
RECOMMENDED SAVINGS* $16,882 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,814
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$482
Cost:
-
- - - - $482 - - - - - -
-
kWh
-
-
kW-months/year
$482
-
$
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,025
Cost:
-
$1,025 11,387 - - - - - - - - $1,025
11,387
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$339
Cost:
$115
$339 3,766 - - - - - - - - $339
3,766
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$675
Cost:
$87
$675 7,500 - - - - - - - - $675
7,500
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$754
Cost:
$322
- - - - - - $754 73 - - -
-
kWh
-
-
kW-months/year
-
-
$
$754
73
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,110
Cost:
$264
- - - - - - $1,110 108 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,110
108
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,774
Cost:
$495
$2,774 30,823 - - - - - - - - $2,774
30,823
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$123
Cost:
$60
$123 1,212 - - - - - - - - $123
1,212
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$314
Cost:
$460
- - - - - - $314 31 - - -
-
kWh
-
-
kW-months/year
-
-
$
$314
31
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14
Cost:
-
$8 82 $6 1 - - - - - - $8
82
kWh
$6
1
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$3,402
Cost:
$13,000
- - - - - - - - $3,402 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,402
-
$
12: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,870
Cost:
$4,230
- - - - - - - - $5,870 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$5,870
-
$
TOTAL RECOMMENDED Savings:
$16,882
Cost:
$19,033
$4,944 54,770 $6 1 $482 - $2,178 212 $9,272 - $4,944
54,770
kWh
$6
1
kW-months/year
$482
-
$
$2,178
212
MMBtu
$9,272
-
$
TOTAL IMPLEMENTED Savings:
$6,814
Cost:
$1,343
$4,944 54,770 $6 1 - - $1,864 181 - - $4,944
54,770
kWh
$6
1
kW-months/year
-
-
$
$1,864
181
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes