IAC Assessment: SU0134
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0134
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product Brake controls and related components for railroad freight cars
NAICS n/a
SIC 3743 - Railroad Equipment
Sales $50,000,000-$100,000,000
# of Employees 261
Plant Area (Sq.Ft.) 258,000
Annual Production 12,400 Pieces
Production Hrs. Annual 3,840
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $481,747 6,395,540 kWh $0.08
Electricity Demand $79,229 14,458 kW-months/year $5.48
Electricity Fees $8,470 - $ -
Natural Gas $262,636 32,985 MMBtu $7.96
TOTAL ENERGY COSTS $865,366
RECOMMENDED SAVINGS* $48,610 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,161
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$14,024
Cost:
$6,613
- - - - - - $14,024 1,998 - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,024
1,998
MMBtu
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,420
Cost:
$89
$11,420 163,142 - - - - - - - - $11,420
163,142
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,470
Cost:
$23,250
- - - - $8,470 - - - - - -
-
kWh
-
-
kW-months/year
$8,470
-
$
-
-
MMBtu
-
-
Tgal
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,103
Cost:
$178
- - - - - - $4,103 584 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,103
584
MMBtu
-
-
Tgal
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,031
Cost:
$706
$2,707 38,667 $1,324 20 - - - - - - $2,707
38,667
kWh
$1,324
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.2514 COVER OPEN TANKS Savings:
$2,938
Cost:
$1,769
- - - - - - $2,938 419 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,938
419
MMBtu
-
-
Tgal
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,453
Cost:
$299
$1,134 16,195 $319 5 - - - - - - $1,134
16,195
kWh
$319
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,197
Cost:
$22
- - - - - - $614 87 $583 - -
-
kWh
-
-
kW-months/year
-
-
$
$614
87
MMBtu
$583
-
Tgal
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$686
Cost:
$1,106
- - - - - - $686 98 - - -
-
kWh
-
-
kW-months/year
-
-
$
$686
98
MMBtu
-
-
Tgal
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$288
Cost:
-
$231 3,302 $57 1 - - - - - - $231
3,302
kWh
$57
1
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$48,610
Cost:
$34,032
$15,492 221,306 $1,700 26 $8,470 - $22,365 3,186 $583 - $15,492
221,306
kWh
$1,700
26
kW-months/year
$8,470
-
$
$22,365
3,186
MMBtu
$583
-
Tgal
TOTAL IMPLEMENTED Savings:
$13,161
Cost:
$388
$12,785 182,639 $376 6 - - - - - - $12,785
182,639
kWh
$376
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption