IAC logo
IAC Assessment: SU0138
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0138
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product material handeling equipment for the wire and fiber optic industries
NAICS n/a
SIC 3500 -
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 70,000
Annual Production 63 Pieces
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,510 687,106 kWh $0.08
Other Energy $92,885 18,577 MMBtu $5.00
TOTAL ENERGY COSTS $146,395
RECOMMENDED SAVINGS* $115,942 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,082
#|Description Savings
Cost
Status Electricity Usage Other Energy Electricity Usage Other Energy
$ kWh $ MMBtu
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,127
Cost:
$1,445
- - $4,127 316 -
-
kWh
$4,127
316
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$939
Cost:
-
$939 12,320 - - $939
12,320
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,706
Cost:
-
$5,706 63,866 - - $5,706
63,866
kWh
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,391
Cost:
-
$6,391 74,880 - - $6,391
74,880
kWh
-
-
MMBtu
05: 4.452 ELIMINATE SHIFT Savings:
$10,752
Cost:
-
$4,156 29,688 $6,596 253 $4,156
29,688
kWh
$6,596
253
MMBtu
06: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$88,027
Cost:
$55,497
- - $88,027 17,605 -
-
kWh
$88,027
17,605
MMBtu
TOTAL RECOMMENDED Savings:
$115,942
Cost:
$56,942
$17,192 180,754 $98,750 18,174 $17,192
180,754
kWh
$98,750
18,174
MMBtu
TOTAL IMPLEMENTED Savings:
$18,082
Cost:
-
$11,486 116,888 $6,596 253 $11,486
116,888
kWh
$6,596
253
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Other Energy Electricity Usage Other Energy