IAC logo
IAC Assessment: SU0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product envelope Printing
NAICS n/a
SIC 2677 - Envelopes
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 56,000
Annual Production 25,373,350 Pieces
Production Hrs. Annual 6,205
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,904 594,500 kWh $0.08
Other Energy $44,874 2,738 MMBtu $16.39
TOTAL ENERGY COSTS $94,778
RECOMMENDED SAVINGS* $86,497 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,409
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Other Energy Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $
01: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$29,798
Cost:
$32,697
- - - - $29,798 1,818 - - - - -
-
kWh
-
-
MMBtu
$29,798
1,818
MMBtu
-
-
$
-
-
$
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$4,584
Cost:
$10,455
- - - - - - $715 - $3,869 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$715
-
$
$3,869
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,371
Cost:
$3,000
- - - - $4,371 266 - - - - -
-
kWh
-
-
MMBtu
$4,371
266
MMBtu
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,432
Cost:
$300
$3,432 38,130 - - - - - - - - $3,432
38,130
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,656
Cost:
$420
$1,656 18,396 - - - - - - - - $1,656
18,396
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$42,656
Cost:
$128,836
$49,904 594,500 $(-52,122) (-10,424) $44,874 2,585 - - - - $49,904
594,500
kWh
$(-52,122)
(-10,424)
MMBtu
$44,874
2,585
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$86,497
Cost:
$175,708
$54,992 651,026 $(-52,122) (-10,424) $79,043 4,669 $715 - $3,869 - $54,992
651,026
kWh
$(-52,122)
(-10,424)
MMBtu
$79,043
4,669
MMBtu
$715
-
$
$3,869
-
$
TOTAL IMPLEMENTED Savings:
$40,409
Cost:
$46,572
$1,656 18,396 - - $34,169 2,084 $715 - $3,869 - $1,656
18,396
kWh
-
-
MMBtu
$34,169
2,084
MMBtu
$715
-
$
$3,869
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Natural Gas Other Energy Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Other Energy Personnel Changes Ancillary Material Cost