IAC logo
IAC Assessment: SU0146
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0146
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product paper products
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 170,000
Annual Production 1,000,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,136 806,400 kWh $0.07
Electricity Demand $62,730 4,190 kW-months/year $14.97
Electricity Fees $7,451 - $ -
Natural Gas $49,424 7,109 MMBtu $6.95
TOTAL ENERGY COSTS $172,741
RECOMMENDED SAVINGS* $52,535 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,562
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$18,266
Cost:
$35,000
$55 832 $72 5 - - $18,139 2,610 - - - - $55
832
kWh
$72
5
kW-months/year
-
-
$
$18,139
2,610
MMBtu
-
-
Tgal
-
-
$
02: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$16,051
Cost:
$38,750
- - - - - - $16,051 6,626 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$16,051
6,626
MMBtu
-
-
Tgal
-
-
$
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$6,273
Cost:
$61,828
- - - - - - $6,273 902 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,273
902
MMBtu
-
-
Tgal
-
-
$
04: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$4,723
Cost:
$420
$(-685) (-10,400) - - - - - - - - $5,408 - $(-685)
(-10,400)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$5,408
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,500
Cost:
$852
$4,500 68,289 - - - - - - - - - - $4,500
68,289
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
06: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$799
Cost:
$1,690
$(-39) (-597) - - - - - - $838 144,000 - - $(-39)
(-597)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$838
144,000
Tgal
-
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$791
Cost:
-
- - - - $791 - - - - - - - -
-
kWh
-
-
kW-months/year
$791
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$494
Cost:
-
$494 7,500 - - - - - - - - - - $494
7,500
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$383
Cost:
$288
$383 5,816 - - - - - - - - - - $383
5,816
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$255
Cost:
$11
$255 3,867 - - - - - - - - - - $255
3,867
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$52,535
Cost:
$138,839
$4,963 75,307 $72 5 $791 - $40,463 10,138 $838 144,000 $5,408 - $4,963
75,307
kWh
$72
5
kW-months/year
$791
-
$
$40,463
10,138
MMBtu
$838
144,000
Tgal
$5,408
-
$
TOTAL IMPLEMENTED Savings:
$11,562
Cost:
$2,973
$4,525 68,659 - - $791 - - - $838 144,000 $5,408 - $4,525
68,659
kWh
-
-
kW-months/year
$791
-
$
-
-
MMBtu
$838
144,000
Tgal
$5,408
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes