IAC logo
IAC Assessment: SU0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product Dried Fruits
NAICS n/a
SIC 2034 - Dehydrated Fruits, Vegetables, Soups
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 50,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 5,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,945 968,160 kWh $0.10
LPG $257,020 41,144 MMBtu $6.25
Other Gas $351 36 MMBtu $9.75
TOTAL ENERGY COSTS $375,316
RECOMMENDED SAVINGS* $247,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $80,698
#|Description Savings
Cost
Status Electricity Usage LPG Other Gas Other Liquid (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage LPG Other Gas Other Liquid (non-haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ MMBtu $ gal $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$163,907
Cost:
$767,895
$99,945 968,160 $77,162 12,400 - - - - $(-13,200) - - - $99,945
968,160
kWh
$77,162
12,400
MMBtu
-
-
MMBtu
-
-
gal
$(-13,200)
-
$
-
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$25,533
Cost:
-
- - $25,533 4,105 - - - - - - - - -
-
kWh
$25,533
4,105
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 4.426 MODIFY WORKLOAD Savings:
$14,400
Cost:
$20,000
- - - - - - - - $14,400 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
$14,400
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$31,584
Cost:
$17,490
- - - - $351 36 $18,000 - $9,389 - $3,844 - -
-
kWh
-
-
MMBtu
$351
36
MMBtu
$18,000
-
gal
$9,389
-
$
$3,844
-
$
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$9,006
Cost:
$3,700
- - $9,006 1,448 - - - - - - - - -
-
kWh
$9,006
1,448
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,438
Cost:
$320
$2,438 48,876 - - - - - - - - - - $2,438
48,876
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$105
Cost:
-
$105 2,105 - - - - - - - - - - $105
2,105
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$70
Cost:
$60
$70 2,797 - - - - - - - - - - $70
2,797
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$247,043
Cost:
$809,465
$102,558 1,021,938 $111,701 17,953 $351 36 $18,000 - $10,589 - $3,844 - $102,558
1,021,938
kWh
$111,701
17,953
MMBtu
$351
36
MMBtu
$18,000
-
gal
$10,589
-
$
$3,844
-
$
TOTAL IMPLEMENTED Savings:
$80,698
Cost:
$41,250
$175 4,902 $34,539 5,553 $351 36 $18,000 - $23,789 - $3,844 - $175
4,902
kWh
$34,539
5,553
MMBtu
$351
36
MMBtu
$18,000
-
gal
$23,789
-
$
$3,844
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ gal $ $ $ $
Electricity Usage LPG Other Gas Other Liquid (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage LPG Other Gas Other Liquid (non-haz) Personnel Changes One-time Revenue or Avoided Cost