Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2003 |
Principal Product | Automotive engine blocks and heads |
NAICS | 331524 - Aluminum Foundries (except Die-Casting) |
SIC | 3400 - |
Sales | $100,000,000-$500,000,000 |
# of Employees | 577 |
Plant Area (Sq.Ft.) | 862,107 |
Annual Production | 1,141,283 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $928,893 | 107,448,400 | kWh | $0.01 |
Electricity Demand | $1,170,402 | 185,265 | kW-months/year | $6.32 |
Natural Gas | $5,075,568 | 1,173,722 | MMBtu | $4.32 |
TOTAL ENERGY COSTS | $7,174,863 | |||
RECOMMENDED SAVINGS* | $1,986,551 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,336,834 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $446,941 Cost: $142,000 |
$(-187) | (-9,360) | $105,804 | 25,191 | $389,124 | 752,658 | $(-47,800) | - |
$(-187) (-9,360) kWh |
$105,804 25,191 MMBtu |
$389,124 752,658 lb |
$(-47,800) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $158,477 Cost: $3,600 |
- | - | $158,477 | 36,648 | - | - | - | - |
- - kWh |
$158,477 36,648 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,336,834 Cost: $875,536 |
- | - | $1,336,834 | 309,446 | - | - | - | - |
- - kWh |
$1,336,834 309,446 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $16,605 Cost: $34,047 |
- | - | $16,605 | 3,844 | - | - | - | - |
- - kWh |
$16,605 3,844 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $8,492 Cost: $4,200 |
- | - | $8,492 | 2,022 | - | - | - | - |
- - kWh |
$8,492 2,022 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,587 Cost: - |
$6,587 | 765,996 | - | - | - | - | - | - |
$6,587 765,996 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,473 Cost: $6,375 |
- | - | $6,473 | 1,497 | - | - | - | - |
- - kWh |
$6,473 1,497 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $4,145 Cost: $12,781 |
- | - | $4,145 | 987 | - | - | - | - |
- - kWh |
$4,145 987 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,997 Cost: $3,315 |
- | - | $1,997 | 462 | - | - | - | - |
- - kWh |
$1,997 462 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,986,551 Cost: $1,081,854 |
$6,400 | 756,636 | $1,638,827 | 380,097 | $389,124 | 752,658 | $(-47,800) | - | $6,400 756,636 kWh |
$1,638,827 380,097 MMBtu |
$389,124 752,658 lb |
$(-47,800) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,336,834 Cost: $875,536 |
- | - | $1,336,834 | 309,446 | - | - | - | - | - - kWh |
$1,336,834 309,446 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||