IAC logo
IAC Assessment: SU0163
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0163
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2003
Principal Product Precast Concrete
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 53
Plant Area (Sq.Ft.) 83,111
Annual Production 80,000 Tons
Production Hrs. Annual 3,770
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,984 723,693 kWh $0.06
Electricity Demand $45,538 3,279 kW-months/year $13.89
Electricity Fees $10,401 - $ -
Natural Gas $45,513 7,659 MMBtu $5.94
LPG $6,129 611 MMBtu $10.03
Other Gas $22,093 2,488 MMBtu $8.88
TOTAL ENERGY COSTS $180,456
RECOMMENDED SAVINGS* $24,119 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,883
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.2192 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS Savings:
$7,056
Cost:
$71,690
- - - - $7,056 1,185 -
-
kWh
-
-
$
$7,056
1,185
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,236
Cost:
$43
$5,236 87,270 - - - - $5,236
87,270
kWh
-
-
$
-
-
MMBtu
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$4,914
Cost:
$540
- - - - $4,914 945 -
-
kWh
-
-
$
$4,914
945
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,900
Cost:
$236
$429 7,144 - - $2,471 416 $429
7,144
kWh
-
-
$
$2,471
416
MMBtu
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,031
Cost:
-
- - $2,031 - - - -
-
kWh
$2,031
-
$
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,756
Cost:
-
$1,756 29,261 - - - - $1,756
29,261
kWh
-
-
$
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$226
Cost:
$116
$226 3,767 - - - - $226
3,767
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$24,119
Cost:
$72,625
$7,647 127,442 $2,031 - $14,441 2,546 $7,647
127,442
kWh
$2,031
-
$
$14,441
2,546
MMBtu
TOTAL IMPLEMENTED Savings:
$18,883
Cost:
$72,582
$2,411 40,172 $2,031 - $14,441 2,546 $2,411
40,172
kWh
$2,031
-
$
$14,441
2,546
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas