IAC logo
IAC Assessment: SU0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2003
Principal Product paint
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 68,500
Annual Production 625,000 Thousand Gallons
Production Hrs. Annual 4,210
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,526 587,129 kWh $0.09
Electricity Demand $34,136 2,703 kW-months/year $12.63
Natural Gas $56,382 7,561 MMBtu $7.46
TOTAL ENERGY COSTS $141,044
RECOMMENDED SAVINGS* $71,211 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,126
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,400
Cost:
-
- - - - - - $1,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,400
-
$
-
-
%
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,210
Cost:
-
$636 7,382 $574 45 - - - - - - $636
7,382
kWh
$574
45
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
03: 4.7310 ADVERTISE PRODUCT OR SERVICE Savings:
$31,250
Cost:
$1,000
- - - - - - - - $31,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$31,250
-
%
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,181
Cost:
$47
- - - - $3,181 427 - - - - -
-
kWh
-
-
kW-months/year
$3,181
427
MMBtu
-
-
$
-
-
%
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$466
Cost:
$57
$266 3,089 $200 16 - - - - - - $266
3,089
kWh
$200
16
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,229
Cost:
$185
$714 8,289 $515 41 - - - - - - $714
8,289
kWh
$515
41
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$21,666
Cost:
$16,761
$9,133 106,080 $3,637 288 - - $8,896 - - - $9,133
106,080
kWh
$3,637
288
kW-months/year
-
-
MMBtu
$8,896
-
$
-
-
%
08: 2.1224 REPLACE BOILER Savings:
$10,809
Cost:
$33,514
- - - - $10,809 1,451 - - - - -
-
kWh
-
-
kW-months/year
$10,809
1,451
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$71,211
Cost:
$51,564
$10,749 124,840 $4,926 390 $13,990 1,878 $10,296 - $31,250 - $10,749
124,840
kWh
$4,926
390
kW-months/year
$13,990
1,878
MMBtu
$10,296
-
$
$31,250
-
%
TOTAL IMPLEMENTED Savings:
$36,126
Cost:
$1,289
$980 11,378 $715 57 $3,181 427 - - $31,250 - $980
11,378
kWh
$715
57
kW-months/year
$3,181
427
MMBtu
-
-
$
$31,250
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Increase in Production