IAC Assessment: SU0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product motors
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $1,000,000-$5,000,000
# of Employees 100
Plant Area (Sq.Ft.) 68,000
Annual Production 50,000 Pieces
Production Hrs. Annual 2,250
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,791 801,159 kWh $0.08
Electricity Demand $49,753 3,591 kW-months/year $13.85
Natural Gas $79,522 69,812 MMBtu $1.14
TOTAL ENERGY COSTS $197,066
RECOMMENDED SAVINGS* $45,054 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,289
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$4,883
Cost:
-
- - - - - - - - $4,883 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$4,883
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,000
Cost:
-
$1,066 12,600 $934 67 - - - - - - $1,066
12,600
kWh
$934
67
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$515
Cost:
-
$421 4,980 $94 7 - - - - - - $421
4,980
kWh
$94
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$325
Cost:
-
- - - - $325 - - - - - -
-
kWh
-
-
kW-months/year
$325
-
$
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,426
Cost:
$120
$761 9,000 $665 48 - - - - - - $761
9,000
kWh
$665
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,140
Cost:
$400
$1,142 13,500 $998 72 - - - - - - $1,142
13,500
kWh
$998
72
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$31,815
Cost:
$30,250
- - - - - - - - $31,815 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$31,815
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,950
Cost:
$4,508
- - - - - - $1,950 222 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,950
222
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,054
Cost:
$35,278
$3,390 40,080 $2,691 194 $325 - $1,950 222 $36,698 - $3,390
40,080
kWh
$2,691
194
kW-months/year
$325
-
$
$1,950
222
MMBtu
$36,698
-
$
TOTAL IMPLEMENTED Savings:
$9,289
Cost:
$520
$2,324 27,480 $1,757 127 $325 - - - $4,883 - $2,324
27,480
kWh
$1,757
127
kW-months/year
$325
-
$
-
-
MMBtu
$4,883
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes