IAC Assessment: SU0191
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0191
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Dairy Products
NAICS 311511 - Fluid Milk Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $100,000,000-$500,000,000
# of Employees 130
Plant Area (Sq.Ft.) 110,300
Annual Production 106,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,594 7,491,750 kWh $0.02
Electricity Demand $2,990 14,699 kW-months/year $0.20
Electricity Fees $7,130 - $ -
Natural Gas $38,145 3,889 MMBtu $9.81
Fuel Oil #6 $304,090 52,157 MMBtu $5.83
TOTAL ENERGY COSTS $486,949
RECOMMENDED SAVINGS* $44,124 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,488
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #6 One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,017
Cost:
-
$998 49,920 $19 96 - - - - $998
49,920
kWh
$19
96
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$382
Cost:
$328
$375 18,720 $7 36 - - - - $375
18,720
kWh
$7
36
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$19,058
Cost:
$25,000
- - - - $19,058 3,286 - - -
-
kWh
-
-
kW-months/year
$19,058
3,286
MMBtu
-
-
$
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$19,254
Cost:
$38,185
$18,708 935,424 $546 2,688 - - - - $18,708
935,424
kWh
$546
2,688
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,413
Cost:
$2,856
$1,413 70,668 - - - - - - $1,413
70,668
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$3,000
Cost:
$7,400
- - - - - - $3,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,000
-
$
TOTAL RECOMMENDED Savings:
$44,124
Cost:
$73,769
$21,494 1,074,732 $572 2,820 $19,058 3,286 $3,000 - $21,494
1,074,732
kWh
$572
2,820
kW-months/year
$19,058
3,286
MMBtu
$3,000
-
$
TOTAL IMPLEMENTED Savings:
$21,488
Cost:
$27,856
$2,411 120,588 $19 96 $19,058 3,286 - - $2,411
120,588
kWh
$19
96
kW-months/year
$19,058
3,286
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #6 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #6 One-time Revenue or Avoided Cost