IAC logo
IAC Assessment: SU0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2005
Principal Product Flexible Packaging
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $50,000,000-$100,000,000
# of Employees 129
Plant Area (Sq.Ft.) 100,000
Annual Production 31,500,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $563,243 10,992,289 kWh $0.05
Electricity Demand $186,801 23,234 kW-months/year $8.04
Electricity Fees $31,462 - $ -
Natural Gas $219,931 30,604 MMBtu $7.19
TOTAL ENERGY COSTS $1,001,437
RECOMMENDED SAVINGS* $395,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $378,858
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$144
Cost:
-
$112 2,202 $32 4 - - - - $112
2,202
kWh
$32
4
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,830
Cost:
-
$3,672 72,000 $1,158 144 - - - - $3,672
72,000
kWh
$1,158
144
kW-months/year
-
-
MMBtu
-
-
$
03: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$371,280
Cost:
$13,500
- - - - - - $371,280 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$371,280
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,792
Cost:
$1,184
- - - - $11,792 1,640 - - -
-
kWh
-
-
kW-months/year
$11,792
1,640
MMBtu
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,434
Cost:
$2,000
$5,649 110,760 $1,785 222 - - - - $5,649
110,760
kWh
$1,785
222
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$395,480
Cost:
$16,684
$9,433 184,962 $2,975 370 $11,792 1,640 $371,280 - $9,433
184,962
kWh
$2,975
370
kW-months/year
$11,792
1,640
MMBtu
$371,280
-
$
TOTAL IMPLEMENTED Savings:
$378,858
Cost:
$15,500
$5,761 112,962 $1,817 226 - - $371,280 - $5,761
112,962
kWh
$1,817
226
kW-months/year
-
-
MMBtu
$371,280
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost