IAC Assessment: SU0202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2005
Principal Product Hardwood Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 37,000
Annual Production 10,000,000 Thousand Feet
Production Hrs. Annual 2,470
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,424 3,663,788 kWh $0.04
Electricity Demand $131,507 15,007 kW-months/year $8.76
Electricity Fees $7,125 - $ -
Natural Gas $6,610 1,738 MMBtu $3.80
TOTAL ENERGY COSTS $309,666
RECOMMENDED SAVINGS* $99,923 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,227
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,315
Cost:
-
$676 15,017 $639 73 - - - - - - $676
15,017
kWh
$639
73
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,691
Cost:
$150
$868 19,291 $823 94 - - - - - - $868
19,291
kWh
$823
94
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,644
Cost:
$500
$847 18,821 $797 91 - - - - - - $847
18,821
kWh
$797
91
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,315
Cost:
$2,000
$676 15,028 $639 73 - - - - - - $676
15,028
kWh
$639
73
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$482
Cost:
$1,330
$377 8,387 $105 12 - - - - - - $377
8,387
kWh
$105
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,577
Cost:
$30,560
- - - - $5,577 - - - - - -
-
kWh
-
-
kW-months/year
$5,577
-
$
-
-
MMBtu
-
-
$
07: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$87,899
Cost:
$535,000
$164,424 3,663,788 $131,461 15,007 - - $6,604 1,738 $(-214,590) - $164,424
3,663,788
kWh
$131,461
15,007
kW-months/year
-
-
$
$6,604
1,738
MMBtu
$(-214,590)
-
$
TOTAL RECOMMENDED Savings:
$99,923
Cost:
$569,540
$167,868 3,740,332 $134,464 15,350 $5,577 - $6,604 1,738 $(-214,590) - $167,868
3,740,332
kWh
$134,464
15,350
kW-months/year
$5,577
-
$
$6,604
1,738
MMBtu
$(-214,590)
-
$
TOTAL IMPLEMENTED Savings:
$10,227
Cost:
$31,210
$2,391 53,129 $2,259 258 $5,577 - - - - - $2,391
53,129
kWh
$2,259
258
kW-months/year
$5,577
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost