Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2005 |
Principal Product | Cellulose Insulation |
NAICS | 322299 - All Other Converted Paper Product Manufacturing |
SIC | 2679 - Converted Paper Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 19,000 |
Annual Production | 1,500,000 Pieces |
Production Hrs. Annual | 3,744 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $34,093 | 531,775 | kWh | $0.06 |
Electricity Demand | $64,086 | 6,060 | kW-months/year | $10.58 |
Electricity Fees | $13,609 | - | $ | - |
Natural Gas | $5,407 | 591 | MMBtu | $9.15 |
TOTAL ENERGY COSTS | $117,195 | |||
RECOMMENDED SAVINGS* | $28,274 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,052 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $206 Cost: - |
$133 | 2,059 | $73 | 7 | - | - |
$133 2,059 kWh |
$73 7 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $2,133 Cost: - |
- | - | - | - | $2,133 | - |
- - kWh |
- - kW-months/year |
$2,133 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,791 Cost: $477 |
$1,178 | 18,121 | $613 | 58 | - | - |
$1,178 18,121 kWh |
$613 58 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $2,489 Cost: $2,000 |
$1,633 | 25,122 | $856 | 81 | - | - |
$1,633 25,122 kWh |
$856 81 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE |
Savings: $21,600 Cost: $21,422 |
- | - | - | - | $21,600 | - |
- - kWh |
- - kW-months/year |
$21,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $55 Cost: $92 |
$34 | 524 | $21 | 2 | - | - |
$34 524 kWh |
$21 2 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,274 Cost: $23,991 |
$2,978 | 45,826 | $1,563 | 148 | $23,733 | - | $2,978 45,826 kWh |
$1,563 148 kW-months/year |
$23,733 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,052 Cost: $569 |
$1,345 | 20,704 | $707 | 67 | - | - | $1,345 20,704 kWh |
$707 67 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost |