Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2005 |
Principal Product | Corrugated sheets and boxes |
NAICS | 322211 - Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 227,246 |
Annual Production | 53,148,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $372,598 | 4,715,200 | kWh | $0.08 |
Electricity Demand | $173,307 | 13,657 | kW-months/year | $12.69 |
Electricity Fees | $27,166 | - | $ | - |
Natural Gas | $322,740 | 53,327 | MMBtu | $6.05 |
TOTAL ENERGY COSTS | $895,811 | |||
RECOMMENDED SAVINGS* | $81,587 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $57,380 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $18,867 Cost: - |
- | - | - | - | - | - | - | - | $18,867 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$18,867 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $16,273 Cost: - |
$12,225 | 154,744 | $4,048 | 319 | - | - | - | - | - | - |
$12,225 154,744 kWh |
$4,048 319 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $9,819 Cost: - |
$6,418 | 81,244 | $3,401 | 268 | - | - | - | - | - | - |
$6,418 81,244 kWh |
$3,401 268 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $10,785 Cost: $500 |
- | - | - | - | - | - | $10,785 | 1,782 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$10,785 1,782 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,763 Cost: $954 |
$5,834 | 73,848 | $1,929 | 152 | - | - | - | - | - | - |
$5,834 73,848 kWh |
$1,929 152 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $7,934 Cost: $652 |
$5,967 | 75,537 | $1,967 | 155 | - | - | - | - | - | - |
$5,967 75,537 kWh |
$1,967 155 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $6,167 Cost: $2,280 |
- | - | - | - | - | - | $6,167 | 1,019 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$6,167 1,019 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,979 Cost: $14,487 |
- | - | - | - | $3,979 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,979 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $81,587 Cost: $18,873 |
$30,444 | 385,373 | $11,345 | 894 | $3,979 | - | $16,952 | 2,801 | $18,867 | - | $30,444 385,373 kWh |
$11,345 894 kW-months/year |
$3,979 - $ |
$16,952 2,801 MMBtu |
$18,867 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $57,380 Cost: $18,221 |
$12,252 | 155,092 | $5,330 | 420 | $3,979 | - | $16,952 | 2,801 | $18,867 | - | $12,252 155,092 kWh |
$5,330 420 kW-months/year |
$3,979 - $ |
$16,952 2,801 MMBtu |
$18,867 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes |