IAC logo
IAC Assessment: SU0318
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0318
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2012
Principal Product Automotive Tires
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales >$500,000,000
# of Employees 1,323
Plant Area (Sq.Ft.) 2,000,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 8,568
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,483,736 89,674,716 kWh $0.05
Electricity Demand $1,268,784 158,598 kW-months/year $8.00
Electricity Fees $166,153 - $ -
Natural Gas $2,981,865 581,871 MMBtu $5.12
TOTAL ENERGY COSTS $8,900,538
RECOMMENDED SAVINGS* $306,618 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $277,439
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,626
Cost:
-
$8,483 169,647 $1,896 237 - - - - - - $2,247 - $8,483
169,647
kWh
$1,896
237
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$2,247
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,917
Cost:
-
$6,469 129,377 $1,448 181 - - - - - - - - $6,469
129,377
kWh
$1,448
181
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$72
Cost:
-
$72 1,440 - - - - - - - - - - $72
1,440
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$106,547
Cost:
$32,436
$(-6,769) (-135,374) $(-1,520) (-190) - - $114,836 22,429 - - - - $(-6,769)
(-135,374)
kWh
$(-1,520)
(-190)
kW-months/year
-
-
$
$114,836
22,429
MMBtu
-
-
$
-
-
$
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$12,250
Cost:
$11,115
$(-325) (-6,506) $(-2,592) (-324) - - - - $5,720 - $9,447 - $(-325)
(-6,506)
kWh
$(-2,592)
(-324)
kW-months/year
-
-
$
-
-
MMBtu
$5,720
-
$
$9,447
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$3,491
Cost:
$4,419
$471 9,419 $240 30 - - $2,780 543 - - - - $471
9,419
kWh
$240
30
kW-months/year
-
-
$
$2,780
543
MMBtu
-
-
$
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$162,692
Cost:
$408,153
- - - - $162,692 - - - - - - - -
-
kWh
-
-
kW-months/year
$162,692
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$812
Cost:
$3,107
$812 16,230 - - - - - - - - - - $812
16,230
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$211
Cost:
$795
$171 3,427 $40 5 - - - - - - - - $171
3,427
kWh
$40
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$306,618
Cost:
$460,025
$9,384 187,660 $(-488) (-61) $162,692 - $117,616 22,972 $5,720 - $11,694 - $9,384
187,660
kWh
$(-488)
(-61)
kW-months/year
$162,692
-
$
$117,616
22,972
MMBtu
$5,720
-
$
$11,694
-
$
TOTAL IMPLEMENTED Savings:
$277,439
Cost:
$441,384
$(-57) (-1,130) $(-32) (-4) $162,692 - $114,836 22,429 - - - - $(-57)
(-1,130)
kWh
$(-32)
(-4)
kW-months/year
$162,692
-
$
$114,836
22,429
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost