IAC logo
IAC Assessment: SU0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2014
Principal Product Electrical Fittings
NAICS 335932 - Noncurrent-Carrying Wiring Device Manufacturing
SIC 3644 - Noncurrent-carrying Wiring Devices
Sales $50,000,000-$100,000,000
# of Employees 118
Plant Area (Sq.Ft.) 139,887
Annual Production 1,520,000 Units
Production Hrs. Annual 7,200
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $534,736 9,040,073 kWh $0.06
Electricity Demand $99,266 35,828 kW-months/year $2.77
Electricity Fees $4,677 - $ -
Natural Gas $398,038 67,082 MMBtu $5.93
TOTAL ENERGY COSTS $1,059,277
RECOMMENDED SAVINGS* $18,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,452
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,295
Cost:
$202
- - - - $1,295 218 - - - - -
-
kWh
-
-
kW-months/year
$1,295
218
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,464
Cost:
$1,840
$2,464 41,760 - - - - - - - - $2,464
41,760
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$1,404
Cost:
$2,959
$1,404 23,795 - - - - - - - - $1,404
23,795
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,593
Cost:
$15,784
- - - - $8,593 1,449 - - - - -
-
kWh
-
-
kW-months/year
$8,593
1,449
MMBtu
-
-
$
-
-
$
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$4,540
Cost:
$15,840
$(-133) (-2,256) $(-1,097) (-396) - - $1,080 - $4,690 - $(-133)
(-2,256)
kWh
$(-1,097)
(-396)
kW-months/year
-
-
MMBtu
$1,080
-
$
$4,690
-
$
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$289
Cost:
$1,250
$268 4,536 $21 8 - - - - - - $268
4,536
kWh
$21
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$18,585
Cost:
$37,875
$4,003 67,835 $(-1,076) (-388) $9,888 1,667 $1,080 - $4,690 - $4,003
67,835
kWh
$(-1,076)
(-388)
kW-months/year
$9,888
1,667
MMBtu
$1,080
-
$
$4,690
-
$
TOTAL IMPLEMENTED Savings:
$5,452
Cost:
$6,251
$4,136 70,091 $21 8 $1,295 218 - - - - $4,136
70,091
kWh
$21
8
kW-months/year
$1,295
218
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost