Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2015 |
Principal Product | Heat Exchangers |
NAICS | 332410 - Power Boiler and Heat Exchanger Manufacturing |
SIC | 3561 - Pumps And Pumping Equipment |
Sales | $50,000,000-$100,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 146,865 |
Annual Production | 77,000,000 Units |
Production Hrs. Annual | 7,488 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $203,967 | 3,628,109 | kWh | $0.06 |
Electricity Demand | $41,012 | 10,764 | kW-months/year | $3.81 |
Electricity Fees | $15,124 | - | $ | - |
Natural Gas | $54,762 | 10,924 | MMBtu | $5.01 |
TOTAL ENERGY COSTS | $329,865 | |||
RECOMMENDED SAVINGS* | $24,708 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,177 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $288 Cost: - |
$202 | 3,600 | $86 | 23 | - | - | - | - | - | - | - | - |
$202 3,600 kWh |
$86 23 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,074 Cost: $200 |
$923 | 16,474 | $151 | 40 | - | - | - | - | - | - | - | - |
$923 16,474 kWh |
$151 40 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $11,567 Cost: $5,737 |
$(-504) | (-9,000) | $(-274) | (-72) | - | - | $537 | - | - | - | $11,808 | - |
$(-504) (-9,000) kWh |
$(-274) (-72) kW-months/year |
- - MMBtu |
$537 - $ |
- - Tgal |
$11,808 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS |
Savings: $6,133 Cost: $4,684 |
$6,133 | 109,516 | - | - | - | - | - | - | - | - | - | - |
$6,133 109,516 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $920 Cost: $849 |
$920 | 16,427 | - | - | - | - | - | - | - | - | - | - |
$920 16,427 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,072 Cost: $2,205 |
$(-245) | (-4,374) | $(-61) | (-16) | $1,378 | 275 | - | - | - | - | - | - |
$(-245) (-4,374) kWh |
$(-61) (-16) kW-months/year |
$1,378 275 MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $218 Cost: $471 |
$218 | 3,895 | - | - | - | - | - | - | - | - | - | - |
$218 3,895 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $104 Cost: $256 |
- | - | - | - | $104 | 21 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$104 21 MMBtu |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $3,332 Cost: $15,700 |
- | - | - | - | - | - | - | - | $3,332 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$3,332 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,708 Cost: $30,102 |
$7,647 | 136,538 | $(-98) | (-26) | $1,482 | 296 | $537 | - | $3,332 | - | $11,808 | - | $7,647 136,538 kWh |
$(-98) (-26) kW-months/year |
$1,482 296 MMBtu |
$537 - $ |
$3,332 - Tgal |
$11,808 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,177 Cost: $6,464 |
$(-84) | (-1,505) | $(-188) | (-50) | $104 | 21 | $537 | - | - | - | $11,808 | - | $(-84) (-1,505) kWh |
$(-188) (-50) kW-months/year |
$104 21 MMBtu |
$537 - $ |
- - Tgal |
$11,808 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | One-time Revenue or Avoided Cost |