IAC logo
IAC Assessment: SU0406
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0406
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2016
Principal Product Wood office furniture
NAICS 337211 - Wood Office Furniture Manufacturing
SIC 2521 - Wood Office Furniture
Sales $5,000,000-$10,000,000
# of Employees 68
Plant Area (Sq.Ft.) 85,000
Annual Production 4,000 Pieces
Production Hrs. Annual 2,600
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,201 1,000,818 kWh $0.07
Electricity Demand $40,829 4,625 kW-months/year $8.83
Electricity Fees $691 - $ -
Natural Gas $31,010 5,534 MMBtu $5.60
TOTAL ENERGY COSTS $141,731
RECOMMENDED SAVINGS* $16,734 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,939
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,885
Cost:
-
$1,186 17,160 $699 79 - - - - - - $1,186
17,160
kWh
$699
79
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,714
Cost:
-
- - - - $1,714 306 - - - - -
-
kWh
-
-
kW-months/year
$1,714
306
MMBtu
-
-
$
-
-
$
03: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$3,795
Cost:
$1,535
$(-40) (-586) $(-318) (-36) - - $315 - $3,838 - $(-40)
(-586)
kWh
$(-318)
(-36)
kW-months/year
-
-
MMBtu
$315
-
$
$3,838
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$644
Cost:
$337
- - - - $644 115 - - - - -
-
kWh
-
-
kW-months/year
$644
115
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$126
Cost:
$145
$126 1,820 - - - - - - - - $126
1,820
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$226
Cost:
$287
$226 3,273 - - - - - - - - $226
3,273
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.1224 REPLACE BOILER Savings:
$8,344
Cost:
$37,133
- - - - $8,344 1,490 - - - - -
-
kWh
-
-
kW-months/year
$8,344
1,490
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,734
Cost:
$39,437
$1,498 21,667 $381 43 $10,702 1,911 $315 - $3,838 - $1,498
21,667
kWh
$381
43
kW-months/year
$10,702
1,911
MMBtu
$315
-
$
$3,838
-
$
TOTAL IMPLEMENTED Savings:
$12,939
Cost:
$37,902
$1,538 22,253 $699 79 $10,702 1,911 - - - - $1,538
22,253
kWh
$699
79
kW-months/year
$10,702
1,911
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost